Though to invest another day to finish timely before rain, just as the rain-fetch pipe was installed, 5 min later, heavy rains set in and will now continue till the 'full autonomy' bathroom is functional by tomorrow, incl light and water from the sky.
Efforts till nearly dark, the bath room has been finished today, cleaned all up and moved the rest to other and next sides.
Glad and rightly pride to have made surely one of the most beautiful and functional bath and toilet in the district, the main builder also share their merits and gratitude that Upasaka Rieng and wife gave them the possibility for a living on good deeds.
The near neighbor Kiem, not having toilet and bath for his family yet, got ways to make use of it, and accepted to look after maintaining and care.
Tomorrow the sight wall by an old robe garment will be added in front of the left monk toilet, as well a bamboo inside to place robes.
May all rejoice with the huge merits of the giver and team.
user:johann:gallery:archiv2023:20230703_01.jpg
user:johann:gallery:archiv2023:20230703_02.jpg
user:johann:gallery:archiv2023:20230703_03.jpg
user:johann:gallery:archiv2023:20230703_04.jpg
user:johann:gallery:archiv2023:20230703_05.jpg
user:johann:gallery:archiv2023:20230703_06.jpg
user:johann:gallery:archiv2023:20230703_07.jpg
user:johann:gallery:archiv2023:20230703_08.jpg
user:johann:gallery:archiv2023:20230703_09.jpg