Another day sacrificed for assistance in doing frame works, measures and iron works. Could not remember more noisy times when thinking back the last 17, 18... well even before, time.
As the work robe got a hole, and all merely nervous that the Lok Ta world get hurt at work, Atma thought "Enough", and offered the rest of the day as last in physical assistance work. That what Atma thinks that the team might have difficulties had been done, and frame work will be well for the Uposatha hall as well.
Good progress, although not so visible yet, will allow to set the main roof construction up tomorrow, which usually will be combined with a cultural ceremony toward the place keeper being, with banana tree and certain offers.
All ooks good so far, and the now 2 x 3 man team seems to work good together. Especially importand, as heavily rains offer less place for separation.
Main iron work, for the rafter, done till sun down with Nyom Chanroth, then up already in the dark.
Mudita
user:johann:gallery:archiv2023:20230825_03.jpg
user:johann:gallery:archiv2023:20230825_04.jpg
user:johann:gallery:archiv2023:20230825_05.jpg
user:johann:gallery:archiv2023:20230825_06.jpg
user:johann:gallery:archiv2023:20230825_07.jpg
user:johann:gallery:archiv2023:20230825_08.jpg
user:johann:gallery:archiv2023:20230825_09.jpg