Short stronger rain at 4:00 brought some water for the next day and ended the working day a little earlier, good to rest a little, take a good clean, and look after small things always delayed.
So the groundwork might be finished tomorrow, as the sand is out of stock as well for now, but other things, necessary to do, will not be hindered so far.
Atma thought of making the middle section to a ground level room (2,30 x 2,30m, maybe 1,9-2,0m high, also a good place to put the bed into, where Atma dwells in the cave, before making the slab to cover tge room, useable for one person to dwell and in the third section where the stairway down in dorection south will be situated, a small bathroom, indoor. That, of course, requires additional tho simple doors and one standard size window to be done, organized.
The second door, to exit south, could be, if already avaliable, brouth at it's place in half a week.
For making the slab (partly floor of the shrine room), the cheap corrugated roof iron (2,5m length, about 10 sheets), as model, would be needed soon.
user:johann:gallery:archiv2020:20200608_04.jpguser:johann:gallery:archiv2020:20200608_05.jpg